Schedule of Works

Prepare a detailed Schedule of Works/specification for the reception area refurbishment works, in a format suitable for tendering purposes. You are not required to produce a Preliminaries or Pre- ambles section or cost.
The schedule of works is for the option 2 refurbishment. Using NBS (national building specification)
The works the will be done can be seen in the difference between the two figures. Existing Plan and option 2.
A schedule explains the method and procedure by which the works will be carried out
What needs to be included?
Materials
Type
Colour
Size
Specific supplier or brand
Method
• Finish required
• Access (scaffolding or ladder?) • Safety requirements