+1 4853618276 support@regentessays.com

Work Breakdown Structures (WBS)

$15.00

Regarding Work Breakdown Structure, you need to create a level 3 WBS for the given case study, which means that we want a block structure similar to the one presented on page 9 of the Work Breakdown Structure lecture notes (Module 4 – Topic 4). Each “part” constitutes a subsystem of your overall system. Thus, you have to name your subsystems the way that I showed in class. Also, you have to explicitly write down the % work that each system represents in order to show the 100% Representation Rule.

SKU: 200116 Category: